“Decision Framework for HVAC Installation Work Package Readiness and Lean Production Control: A Worked Example”. Reports in Mechanical Engineering, vol. 7, no. 2, Sept. 2026, pp. 302-24, https://doi.org/10.5281/zenodo.22976334.